National Grid EV Network Capacity
National Grid Distribution
NG network existing capacity. This capacity is reviewed by NG at a street by street level using local distribution substations. The available capacity at each site is assessed and represented as a generic level of Electrical Vehicle (EV) charging capacity.
The three levels are:
-Extensive capacity available
-Capacity available
-Limited capacity available
Use this data in another application
Please refer to the licence to understand the conditions of using this data.
Maps using this data (0)
Groups using this data (0)
Attributes (20)
Or display data on an existing map
- Type:
- Spatial data
- Publication date:
- 06 May 2022
- Licence:
- NGED Open Data Licence
-
Copyright:
- Point of contact:
- data@gov.wales
- Language
- English